CERN’s Future Circular Collider (FCC) is an ambitious proposal designed to deepen our understanding of the Universe. If approved, it would be Europe’s next-generation particle collider: a unique facility capable of advancing scientific discovery while driving technology, innovation and skills for decades to come. The FCC would be housed in a 91-kilometre tunnel, at an average depth of 200 metres, beneath the existing CERN site and surrounding areas of France and Switzerland, including a section beneath Lake Geneva.

As part of its extensive feasibility studies, CERN needed a detailed understanding of the ground conditions along the proposed tunnel route. In 2023, it issued a tender for an investigation of the local geology. The contract was awarded to UK company Structural Soils Limited (SSL), which has provided award-winning geotechnical and geoenvironmental ground investigation services to clients nationally and internationally since 1964.

A three-company consortium was formed to provide CERN with specialist expertise and the best possible value. SSL brought experience in managing large-scale ground investigation projects with exacting safety and quality requirements, supported by in-house specialists in in-situ testing, laboratory testing, reporting and contract management. Ginger Geotec contributed extensive expertise in deep drilling and testing, together with established knowledge of and contacts associated with the wider FCC project. Smart Seismic Solutions, a local French company, provided detailed knowledge of regional restrictions and requirements, as well as a specialist geophysics team able to manage and deliver every aspect of the geophysical works.

What did CERN need?

Structual Soils logo

The project’s main objective was to validate the proposed position and geometry of the FCC. Ground investigation services including geophysical surveys, borehole drilling and laboratory testing were required at multiple locations along the proposed alignment. Core drilling and seismic profiling would refine the tunnel route through critical zones at the surface and around the tunnel roof, particularly in limestone areas beneath the mountains. The campaign focused on nine “high-risk areas” considered critical to the alignment, helping CERN assess the associated costs and risks and inform the feasibility study.

The scope included service clearance and the construction of stone drilling platforms by local companies, together with geophysical investigations using very-high- and high-resolution seismic reflection and seismic refraction. The team completed exploratory boreholes, logging and sampling, as well as ten rotary boreholes using open-hole and cored drilling to depths of 70–510 metres.

Measurement while drilling (MWD) was used to record parameters during non-cored drilling. The programme also included core logging, photography and the sampling of soils and rock for laboratory testing; in-situ and Lugeon testing; and downhole borehole logging using gamma-ray, full-wave sonic, calliper and wall-imaging techniques. Groundwater-monitoring piezometers were installed in selected boreholes, along with remote automatic data loggers. The project duration was approximately 25 weeks, beginning in September 2024.

The drilling programme was designed to obtain stratigraphic information, in-situ data and samples from which ground parameters could be established for the design. It also assessed hydrocarbon potential and ground-gas risk, gathered groundwater information, and investigated karstic limestone and potential artesian pressures. Together, these findings addressed gaps in existing knowledge and helped identify a suitable, continuous tunnelling medium for the tunnel-boring machine.

Why was Structural Soils Limited chosen for the project?

SSL has extensive ground investigation experience, with more than 250 employees working on national and international projects. Its expertise includes assessing ground conditions, mitigating risks to building foundations and identifying lower-risk areas for construction. As consortium lead, SSL contributed large-scale project management, specialist testing, reporting and contract-management expertise. Ginger Geotec brought deep-drilling experience and knowledge of the wider project, while Smart Seismic Solutions contributed local insight and specialist geophysical capability.

Rock core in core barrel from CERN drilling site - Andrea Moscariello - UNIGE

Rock core in core barrel from CERN drilling site - Andrea Moscariello - UNIGE

What’s it like working with CERN?

Steve Mackereth, Managing Director of SSL, says: “CERN is a technically demanding customer, as it has to be given the nature of its work. Working with adjudicators from the outset was unusual for us, as they would normally become involved only when a problem arose. Overall, CERN was very positive and the project management was excellent. Despite the challenging nature of the work, the project was delivered on time and within budget. Contingency planning was key: we identified potential scenarios and had solutions in place.”

What was the impact on Structural Soils Limited?

Although SSL has extensive technical experience, working with CERN presented new challenges. The company had not previously acted as lead partner in a consortium or delivered a project of this scale in France. It also engaged British contractors living near CERN to help deliver the work.

The technical demands were significant. The project required deeper boreholes than the company had previously drilled, while winter working meant managing substantial volumes of water during drilling operations. Samples also had to be returned to the UK for testing to French standards and reviewed by French auditors who visited SSL’s laboratories in Bristol.

Steve says: “This has been a highly successful project that we are incredibly proud of. Working as part of a consortium meant that we learned from one another, developed our expertise and improved our knowledge of drilling boreholes, particularly deeper ones. Financially, the work helped meet our turnover requirements. It also developed our skilled workforce and created opportunities for additional British contractors.

“Ginger Geotec has since approached us about joining other bids. This has led to the company joining us on a prestigious pumped-storage project in Scotland and to another tender in Scotland. We are also exploring future opportunities, including work with contractors that may deliver the wider FCC project. Overall, it has been a brilliant experience, and this project positions us well for future national and international projects.”

Quote marks icon

“All works were delivered to a high technical and safety standard, despite the additional challenges associated with operating in a new market and in demanding geological conditions. In my role as CERN’s project manager for these works, I found Structural Soils, Ginger Geotec and SGS3 to be highly practical, constructive and straightforward to work with.”

Roddy Cunningham, CERN

For more information, please contact the UK Industrial Liaison Office:

Richard Farrow, Head of Industrial Liaison
richard.farrow@stfc.ukri.org | Tel: +44 7596 888677

Sara Fletcher, Deputy Head of Industrial Liaison
sara.fletcher@stfc.ukri.org | Tel: +44 7733 265422

Alan Silverman, Assistant UK ILO
Alan.silverman@cern.ch

Julie Perrin, ILO Assistant, Price Enquiries
Julie.perrin@stfc.ukri.org

If you need help with export, please contact:

Marie Gow, Senior Trade Officer
Marie.Gow@fcdo.gov.uk
Tel: +41 79 663 9246 | www.export.great.gov.uk/